Chassis Durability Assessment
A half-day on-site inspection of frame welds, mounting rails, and vibration stress points on rigs rated 0.05 TH/s and above, with a written report and prioritized repair schedule.
A half-day on-site inspection of frame welds, mounting rails, and vibration stress points on rigs rated 0.05 TH/s and above, with a written report and prioritized repair schedule.
Farm operators running 20 or more units who have noticed frame fatigue, buyers evaluating second-hand ASIC hardware before a large purchase, and facility managers planning extended service intervals without unplanned downtime.
Starting at ₩850,000 for farms up to 50 units within Gyeonggi Province. Additional units and travel beyond 80 km from Yongin are quoted separately. A 30% deposit is required to confirm the visit date.
Contact us with your farm details and preferred visit window. We typically schedule within one to two weeks.